Refurbishment Phases

Phase One

Unloading and Receipt

Safe unloading and transport to the service area. Delivery verification based on documentation.

ID Verification and Initial Inspection

Identification and recording of serial numbers. Visual condition assessment, verification of mission or lock/seal.

Component Disassembly

Removal of key machine components and assessment of part reusability.

Cleaning and Sanitization

emoval of dirt, product residue, and deposits. Disinfection of components that come into contact with food or beverages

Component Replacement, Service, and Assembly

Replacement of worn or damaged components and reassembly according to technical documentation.

Phase Two:

Functional Testing and Quality Assurance

esting all device functions. Verification of payment mechanisms and product distribution systems.

Efficiency Measurement and System Reset

Resetting settings and ensuring their correct operation.

Parts Usage Logging and Reporting

Database update and generation of final service reports.

Machine Packing

Securing the device for transport and final quality inspection.

Preparation for Shipment

Labeling and shipping marks on packaging. Organization of transport and logistics.